GEOSIP // REV 2 TECHNICAL BRIEF · NC RESIDENTIAL WALL SYSTEM
Preliminary Concept · Not For Construction Estimates & Projections Only
CEMENT-FREE GEOPOLYMER STRUCTURAL INSULATED WALLS // REV 2

GeoSIP
Wall System

A monolithic, mineral-skinned structural insulated wall architecture pairing fiber-reinforced, ambient-cured geopolymer skins with a continuous 6-inch EPS foam core and non-metallic GFRP shear ties. Engineered for lower projected lifetime cost, faster dry-in, continuous thermal performance, and stone-like architectural permanence using North Carolina & Southeast local materials.

0.75–1.0 IN GEOPOLYMER SKINS · 6.0 IN EPS CORE · 45° GFRP SHEAR GRID · ZERO DRYWALL · ZERO SIDING
Concept architectural render of a modern compact GeoSIP residence with smooth integral-colored monolithic mineral walls and clean vertical reveal joints
FIG 01 · Concept Render — Monolithic Mineral Wall Envelope CONCEPT ILLUSTRATION
Engineering Disclosure
Every cost, weight, schedule, R-value, and structural value on this page is a preliminary Rev 2 engineering estimate derived from modeled assemblies. GeoSIP is not yet code-listed or lab-certified; physical mock-up testing and a per-house North Carolina PE stamp (2018 NCRC R104.11) are required prior to construction.
Est. 30-Yr TCO Savings vs Wood 2×6
-$3,564 to -$8,962
Site-spray owned rig: -$3,564 (One 600 ADU) to -$8,962 (1,800 sf house). 8×9 shop panel: -$929 to -$5,077. Modeled estimates.
Est. Site Dry-In Duration
3.5–6.5 d
Projected wall erection vs 13.0–20.0 site days for Wood 2×6 framing, sheathing, siding, insulation & drywall.
Modeled Continuous Core Insulation
R-22
Projected effective value from unbroken 6.0-in EPS core with zero wood or steel thermal bridges (targets NC CZ4 R-20 code).
Projected Structural Wind Target
120 mph
Exposure C design target (L/500+ to L/581 modeled deflection) with 1.0-in interior concrete thermal barrier (NCRC R316.5.1 target).

* All KPI values above are modeled Rev 2 projections reconciled to identical exterior-wall scopes (structure, insulation, WRB/seals, exterior & interior finish, erection, waste, and 8% contingency; excluding shared slab, roof, windows, doors, and MEP rough-in). House #1 site-spray on rented gear ($0 capex) projects -$112 Direct (One 600) to -$1,002 Direct (1,800 sf) vs Wood; larger savings assume an owned $22,090 mobile rig amortized across 50 houses/yr.

One Monolithic Assembly Replacing Five Conventional Wall Trades

Conventional stick-built exterior walls stack framing, OSB sheathing, housewrap, cavity batt insulation, vinyl siding, and taped/painted gypsum drywall across separate trades. GeoSIP consolidates structural shell, continuous insulation, thermal barrier, and finished architectural surfaces into a single mineral-and-EPS composite wall.

01 · Cost & 30-Yr TCO

Projected Below Wood 2×6

Eliminating siding, drywall, framing lumber, and multi-trade markups projects Owner-Bid savings of -$136 to -$2,952 on a 600 sf ADU and -$1,937 to -$6,077 on a 1,800 sf house vs Wood 2×6, with lower modeled maintenance and HVAC carry over 30 years.

Modeled Estimate

02 · Build Speed

3.5 to 6.5 Projected Site Days

Shop-cast 8×9 panels project 3.5 site days (One 600) or 5.5 site days (1,800 sf); site-sprayed foam blocks project 4.5 to 6.5 site days—replacing an estimated 13 to 20 site days (101–186 MH) of wood framing, sheathing, siding, and drywall.

Modeled Schedule

03 · Fire Resistance

1.0-in Interior Mineral Barrier

Designed to meet 2018 NCRC / IRC R316.5.1 using a full 1.0-in interior geopolymer concrete skin over foam plastic—targeting zero drywall and avoiding multi-month NFPA 286 listing delays for Houses 1–3. Noncombustibility (ASTM E136) pending lab test.

ASTM E136 Pending

04 · Thermal Envelope

Continuous R-22 Core

An unbroken 6.0-in ASTM C578 EPS core paired with non-metallic 45° GFRP shear ties eliminates both wood-stud and steel-truss thermal bridging, projecting R-22 effective insulation designed to exceed North Carolina Climate Zone 4 R-20 wall requirements.

Modeled R-Value

05 · Durability

Rot, Mold & Termite Resistant

Inorganic geopolymer mineral skins, closed-cell EPS foam, AR-glass mesh, and GFRP reinforcement contain zero wood studs, zero paper-faced drywall, and zero rust-prone steel shear trusses—designed for humid Southeast climates with breathable matte siloxane exterior sealing.

Inorganic Assembly

06 · Wind & Structure

120 mph Exp C Target

Composite sandwich action via continuous 45° AR-glass/epoxy GFRP shear-grid strips (@ 24 in o.c.) plus a cast haunched 3-in bond beam and embedded Simpson HETA20 truss anchors targets L/500+ to L/581 deflection and P_cr = 10,750 plf (symmetric baseline).

AC422 & PE Pending

07 · Architectural Finish

Integral-Color Mineral Walls

Pigmented throughout with mineral iron-oxide color for a smooth, matte stone-like finish inside and out—zero vinyl siding to fade and zero drywall seams to mud. An optional limestone elastomeric formliner facade is priced as a future post-House-3 upgrade (+$1,547 / +$2,522 Direct est.).

Smooth Baseline

08 · Local Supply & Carbon

Cement-Free NC Materials

Ambient-cured geopolymer binder blends regional Class F fly ash (60–65%) and GGBFS slag (35–40%) with Raleigh granite sand or NC Stalite expanded slate and NC-molded EPS—replacing Ordinary Portland Cement with zero heat-curing kilns required.

Cylinder Tests Pending

7.75-in / 8.0-in Composite Wall Anatomy

Technical architectural cross-section cutaway diagram of the GeoSIP wall showing 0.75-in exterior geopolymer skin, 6.0-in EPS core, 1.0-in interior geopolymer skin, 45-degree GFRP shear grid, AR-glass mesh on standoffs, and cast haunched 3-in top bond beam
FIG 02 · Wall Cross-Section Cutaway (0.75" Ext / 6.0" EPS / 1.0" Int) SCHEMATIC DIAGRAM
Wall Layer / Component Rev 2 Specification Design Role
Exterior Mineral Skin 0.75 in (rec.)
1.00 in (base)
Fiber-reinforced geopolymer (0.5% AR-glass fiber + 4.5 oz AR mesh), integral iron-oxide color, matte breathable siloxane sealer.
Insulating Core 6.00 in EPS 1.25 pcf nominal ASTM C578 Type I/II rigid EPS foam; CNC-cut tie kerfs, bond-beam trough, lintel troughs, and interior wire chases. Modeled R-22 effective.
Interior Mineral Skin 1.00 in Kept at full 1.0 in across all variants to target 2018 NCRC / IRC R316.5.1 concrete thermal barrier over foam plastic (no drywall).
Composite Shear Ties 45° GFRP
@ 24" o.c.
Continuous AR-glass/epoxy GFRP shear-grid strips (AC422 type); zero metallic thermal bridge; modeled K_sh = 418 psi (1.0/1.0) / ~360 psi (0.75/1.0).
Top Bond Beam & Uplift 3.0 in cast
2 #4 GFRP
Monolithic haunched geopolymer bond beam (1.5-in fillets, AR mesh, 2 #4 GFRP bars) with embedded Simpson HETA20 roof truss anchors.
Openings & Lintels 10.0 in cast
2 #4 GFRP
Monolithic cast geopolymer lintels over windows and 6'-2" patio sliders; eliminates steel C-channel (saving -$1,263 Direct est. on One 600).
Electrical Chases 1.5" × 1.5" Hot-wire routed interior EPS chases + clean baseboard/surface raceway; field-wired by a licensed NC electrician so NC Modular rules do not apply.

Modeled composite stiffness (corrected Newmark check, EA* = EA/2): symmetric 1.0/1.0 baseline models I_c = 296.0 in⁴/ft, K_sh = 418 psi at γ = 0.020, L/581 deflection, P_cr = 10,750 plf; recommended 0.75/1.0 models I_c = 247 in⁴/ft, L/500+ at 120 mph Exp C. All structural numbers await AC422 push-off prisms and NC PE review.

Material Role in Mix / Wall Regional Supply Footprint One 600 Est. 1,800 sf Est. Pricing Basis
Class F Fly Ash (ASTM C618) 60–65% geopolymer binder NC / SC commercial hubs (~35 mi from Raleigh) $225 $412 Published index $125/MT
GGBFS Slag Cement 35–40% ambient cure (no kilns) SE bulk delivery (est. $110/MT del.) $132 $242 Modeled estimate
Granite Sand / NC Stalite Aggregate (131 pcf sand or 108 pcf LWC) Raleigh quarries / Gold Hill–Salisbury NC (~105 mi) $206* $376* Sand verified; Stalite $115/t est.
Liquid Sodium Silicate (multi-tote) Alkaline activator (bulk contract) NC chemical hubs ($600/MT) $355 $649 Published bulk contract
50% NaOH Caustic Soda (IBC tote) Alkaline activator NC municipal bid / Charlotte–Greensboro ($733/MT) $190 $347 Published municipal bid
Retarder / HRWR Admixture 30–45 min slag-blend open time Commercial admixture ($10/m³ est.) $46 $84 Modeled estimate
6.0-in Rigid EPS Core (CNC) Continuous R-22 core (ASTM C578) Direct NC/VA molders (Statesville / Cherryville) $1,440 $2,630 Direct molder $1.80/sf
AR-Glass Chopped Fiber (1/2 in, 0.5% vol) Crack-control fiber (ZrO₂ ≥ 16.5%) Commercial Cem-FIL bag stock ($4.00/lb) $489 $894 Published catalog
AR-Glass / EIFS 4.5 oz Mesh (both faces) Full-surface skin reinforcement Commercial alkali-resistant mesh ($0.10/sf) $162 $296 Catalog + overlap/freight
45° GFRP Shear-Grid Ties Composite thermal-break ties @ 24" o.c. SE GFRP pultruders (modeled $0.76/lf) $317 $579 Modeled estimate
Integral Iron-Oxide Pigment + Sealer Through-body color + clear matte siloxane NC masonry yards ($3.20/lb + sealer) $125 $229 Published catalog
Bond Beam, Hardware, Seals, Chases & 5% Waste #4 GFRP, sill track, inserts, bolts, HETA20, seals, release, trim NC structural & precast hardware supply $1,747 $3,115 Modeled estimate
Rev 2 Baseline Total Materials (incl. 5% waste, symmetric 1.0/1.0 shop baseline) $5,435 $9,852 $7.36/sf / $7.31/sf net est.

* Granite sand baseline shown in table ($206 / $376). Swapping to NC Stalite expanded-slate aggregate with a 0.75-in exterior skin on 8×9 panels is net cost-negative (-$64 One 600 / -$117 1,800 sf materials & gear) because the thinner exterior skin offsets the lightweight aggregate premium. Site-spray adds 15% modeled rebound (+10% over shop waste) while removing shop lifting inserts and panel-joint sealant.

Two Engineered Build Paths. Same Core Wall Physics.

Rather than locking early builds into heavy cranes or a high-capex factory before field demand proves out, GeoSIP Rev 2 defines two complementary delivery paths using the exact same 0.75-in exterior / 6.0-in EPS / 1.0-in interior composite wall section.

Dual build process technical diagram comparing Path A site-built hand-stacked 4x9 EPS foam blocks with ICF braces and 2-pass sprayed geopolymer skins against Path B 8x9 Stalite shop-cast panels placed by compact skid-steer
FIG 03 · Delivery Comparison — Site-Built Spray-On (Left) vs 8×9 Shop-Cast Panel (Right) PROCESS SCHEMATIC

Path A · Leading Candidate for Houses 1–10

Site-Built Spray-On Foam Block
Gated on $500 Mock-Up

One person hand-carries and stacks full-height 4'-0" × 9'-0" × 6.0-in CNC ship-lap EPS blocks (~22.5 lb est. each; 25 blocks One 600 / 45 blocks 1,800 sf) on a slab sill track, inserts 45° GFRP shear-grid strips into factory kerfs, clips AR mesh on 3/8-in standoffs, braces plumb with standard ICF turnbuckle braces (@ 6 ft o.c.), and sprays both mineral skins in 2 passes using a peristaltic mortar pump + rented 185 CFM air compressor.

  • Equipment Capex (Est.): $22,090 owned mobile rig ($88/house over 5 yr / 50 hs/yr) — or $0 capex on House #1 with rented pump, compressor & ICF braces.
  • Crew & Speed (Est.): 1–2 workers stack/brace foam; 3–4 workers spray & finish (batcher, nozzleman in caustic PPE, 1–2 screed/trowel finishers). 4.5 site days (58.0 MH) One 600 / 6.5 site days (100.0 MH) 1,800 sf.
  • Key Advantages: Zero shop bay, zero cranes, zero vertical panel joints (seamless monolithic shell), 100% site-built (completely outside NC Modular 11 NCAC 08 .0600), and lowest projected Direct, Owner-Bid, and 30-yr TCO (-$2,226 to -$3,273 Direct vs 8×9 shop panels).
  • Honest Field Constraints: Requires full caustic spray PPE (NIOSH full-face P100, chem suits, portable eyewash) for two-part liquid NaOH/silicate mist, 15% modeled wet-mix rebound, strict 15-min hose flush discipline, and ACI 506.2 weather limits (40°F–90°F, no active rain; est. ~25–40 weather-affected days/yr in Raleigh).

Path B · High-Volume / All-Weather Scale

8' × 9' NC Stalite Shop Panel
365-Day Indoor QC

Standardized 8'-0" × 9'-0" × 7.75" panels cast flat wet-on-wet in an owned 3,500–4,000 sf bay using NC Stalite expanded-slate geopolymer (modeled at 108 pcf until cylinders are cast; published Stalite structural concrete is 100–115 pcf). Cuts projected panel weight to 1,437 lb (-51% to -58% vs full-wall baseline) while keeping a 6'-2" patio slider inside one unbroken panel.

  • Equipment Capex (Est.): $104,500 lean starter shop (-$40,500 vs $145k full-wall shop): casts 2 panels per flat tilt-table (6 panels/day), drops 5-ton crane to 2-ton gantry, and drops 8k forklift to 4k forklift.
  • Handling & Speed (Est.): 2 cast-in lifting inserts + $350/day rented skid-steer w/ fork jib (or owned 2,000 lb Proctor wall jacks + rolling panel carts on tight backyard ADU lots). 3.5 site days One 600 / 5.5 site days 1,800 sf.
  • Key Advantages: Guaranteed flat oiled-steel form finish both sides, zero jobsite caustic spray mist, zero rain/cold curing stops, standard legal flatbed transport (no oversize permits), and seamless Day-1 fallback to normal-weight granite sand (1,930 lb) on the exact same tables.
  • Honest Trade-Offs: Requires shop space and $104.5k lean equipment investment, introduces sealed vertical reveal joints (14 panels / 126 lf ADU; 24 panels / 216 lf 1,800 sf), and runs +$2,226 to +$3,273 higher projected Direct cost than owned-rig site spraying.

Apples-to-Apples Exterior Wall Comparison vs Wood, Steel & OSB SIP

All systems are modeled on identical exterior-wall scopes (structure, insulation, WRB/seals, exterior & interior finish, erection, waste, and 8% contingency; excluding shared slab, roof, windows, doors, and MEP rough-in). Owner-Bid applies Direct × 1.10 shop × 1.15 GC (1.265×) for GeoSIP vs Raleigh subcontract rates + 15% GC. 30-yr TCO (7% discount rate) includes wall HVAC NPV, maintenance NPV, per-house NC PE stamp ($2,000 One 600 / $2,500 1,800 sf), and schedule carry credit vs Wood.

Table A · One 600 ADU (738 sf Net Wall Area · 98 lf Perimeter) — All Totals Projected / Modeled

Wall System Equip Capex (Est.) Direct Est. ($/sf) Δ Direct vs Wood Owner-Bid Est. ($/sf) Δ Bid vs Wood 30-Yr TCO Est. Δ TCO vs Wood Shop + Site MH (Days)
GeoSIP Site-Built Spray-On (0.75" / 1.0", owned rig) $22,090 $8,249 ($11.18) -$1,367 $10,435 ($14.14) -$2,952 $12,036 -$3,564 0 + 58.0 MH (4.5 d)
GeoSIP Site-Built House #1 Rental-Only (0.75" / 1.0") $0 $9,504 ($12.88) -$112 $12,023 ($16.29) -$1,364 $13,624 -$1,976 0 + 58.0 MH (4.5 d)
GeoSIP 8×9 NC Stalite Shop Panel (0.75" / 1.0", 14 panels) $104,500 lean $10,475 ($14.19) +$859 $13,251 ($17.96) -$136 $14,671 -$929 22.4 + 25.6 MH (3.5 d)
GeoSIP Full-Wall Shop Baseline (1.0" / 1.0", 8 panels) $145,000 lean* $10,406 ($14.10) +$790 $13,164 ($17.84) -$223 $14,584 -$1,016 20.0 + 24.0 MH (3.5 d)
Wood 2×6 Baseline (Vinyl Siding + Drywall) $0 (subs) $9,616 ($13.03) $0 $13,387 ($18.14) $0 $15,600 $0 0 + 101.4 MH (13.0 d)
CFS Steel Stud (CI + Vinyl + Drywall) $0 (subs) $12,038 ($16.31) +$2,422 $16,661 ($22.58) +$3,274 $19,003 +$3,403 0 + 117.0 MH (14.0 d)
OSB SIP 6.5-in (Vinyl + Drywall) $0 (subs) $14,150 ($19.17) +$4,534 $18,237 ($24.71) +$4,850 $19,236 +$3,636 12.0 + 73.8 MH (8.0 d)

Table B · 1,800 sf Residence (1,348 sf Net Wall Area · 180 lf Perimeter) — All Totals Projected / Modeled

Wall System Equip Capex (Est.) Direct Est. ($/sf) Δ Direct vs Wood Owner-Bid Est. ($/sf) Δ Bid vs Wood 30-Yr TCO Est. Δ TCO vs Wood Shop + Site MH (Days)
GeoSIP Site-Built Spray-On (0.75" / 1.0", owned rig) $22,090 $14,574 ($10.81) -$3,039 $18,436 ($13.68) -$6,077 $19,593 -$8,962 0 + 100.0 MH (6.5 d)
GeoSIP Site-Built House #1 Rental-Only (0.75" / 1.0") $0 $16,611 ($12.32) -$1,002 $21,013 ($15.59) -$3,500 $22,170 -$6,385 0 + 100.0 MH (6.5 d)
GeoSIP 8×9 NC Stalite Shop Panel (0.75" / 1.0", 24 panels) $104,500 lean $17,847 ($13.24) +$234 $22,576 ($16.75) -$1,937 $23,478 -$5,077 38.4 + 40.0 MH (5.5 d)
GeoSIP Full-Wall Shop Baseline (1.0" / 1.0", 12 panels) $145,000 lean* $17,288 ($12.82) -$325 $21,870 ($16.22) -$2,643 $22,772 -$5,783 30.0 + 36.0 MH (5.5 d)
Wood 2×6 Baseline (Vinyl Siding + Drywall) $0 (subs) $17,613 ($13.07) $0 $24,513 ($18.18) $0 $28,555 $0 0 + 185.7 MH (20.0 d)
CFS Steel Stud (CI + Vinyl + Drywall) $0 (subs) $21,988 ($16.31) +$4,375 $30,432 ($22.58) +$5,919 $34,710 +$6,155 0 + 213.7 MH (22.0 d)
OSB SIP 6.5-in (Vinyl + Drywall) $0 (subs) $25,846 ($19.17) +$8,233 $33,312 ($24.71) +$8,799 $34,761 +$6,206 18.0 + 134.8 MH (12.0 d)

* Full-Wall Shop Baseline Direct conservatively books a $260k shop amortization ($1,040/house over 5 yr / 50 hs/yr); using the $145k lean starter shop saves an additional -$497 Direct / -$629 Owner-Bid per house. Note on House #1 site-spray: rented gear ($0 capex) comes out close to Wood on Direct (-$112 One 600 / -$1,002 1,800 sf); the larger cost wins assume the owned $22,090 rig amortized over volume and remain estimates until the $500 mock-up confirms actual spray labor and rebound.

Monolithic Exterior. Calm Mineral Interior.

Concept architectural exterior view of a single-story GeoSIP home with smooth integral-colored monolithic geopolymer walls, flush modern windows, and clean architectural reveal joints
FIG 04 · Exterior Concept — Integral-Color Mineral Facade CONCEPT RENDER · NOT BUILT
Concept minimalist residential interior featuring smooth integral-colored geopolymer mineral walls, clean vertical reveal joints, recessed baseboard raceway, and soft natural daylight
FIG 05 · Interior Concept — Smooth Mineral Finish & Reveal Joints CONCEPT RENDER · NOT BUILT

Seams & Surface Finish

Monolithic or Reveal Joints

Site-sprayed walls create a continuous seamless mineral shell with deliberate architectural control joints. Shop-cast panels use crisp visible reveal joints sealed with color-matched elastomeric sealant—avoiding drywall taping and mudding. Optional limestone formliner or plastered seamless skim are planned as post-House-3 finish upgrades.

Mounting & Everyday Use

Solid 1.0-in Interior Skin

Light art mounts with adhesive strips or masonry nails. Heavier fixtures anchor with a masonry bit and concrete screws or toggle anchors behind the 1.0-in skin. TVs and kitchen cabinetry anchor into wood or steel blocking embedded directly in the wall layout during casting or pre-spray framing.

Maintenance & Patching

Mineral Repairability

Holes or chips fill with geopolymer or cementitious mineral patch, sand flush, and touch up with matching integral-pigment color (patch color match and seam cracking are explicitly scheduled on the physical prototype test list). Exterior faces receive a breathable matte siloxane water repellent.

What Is Modeled vs. What Must Be Physically Tested

Zero Unverified Claims Policy
GeoSIP Rev 2 is a preliminary engineering concept. It does not hold an ICC-ES evaluation report, DrJ TER, Intertek CCRR, UL listing, or completed third-party lab certification. Houses 1–3 require a site-specific North Carolina Professional Engineer (PE) stamp under 2018 NCRC R104.11 / IRC R301.1.3 backed by the physical tests listed below.
Validation Gate Status Target Metric / Code Path Why Required Before House #1
1. Weekend 4'×8' Vertical Spray Mock-Up (~$500 est. + ~$200 bench screen) Required First Compare retarded two-part geopolymer vs one-part / slag-CSA mineral mortar; rebound <15%; 4 core drills proving zero mesh voids & ≥1.0-in interior (ACI 506.2). Verifies caustic mist safety, pump washout, vertical sag resistance, screed finish flatness, and actual spray labor before committing to site spraying.
2. Ambient Binder & Stalite Cylinders Not Yet Cast 24h ≥ 3,000 psi, 28d ≥ 5,000 psi, peak exotherm <70°C against EPS, ASTM C157 shrinkage <0.07%; Stalite 108 pcf equilibrium density check. Confirms ambient slag/fly-ash cure without kilns and verifies actual Stalite geopolymer density & strength before stamping structural calcs.
3. AC422 Shear-Grid Push-Off & Insert Pullout Not Yet Tested Composite stiffness K_sh ≥ 418 psi (1.0") / ≥360 psi (0.75"), tie pullout ≥1,200 lb; 24h lifting insert pullout at 4× SWL (if shop-cast). Validates Newmark composite bending assumptions (L/500+ to L/581 at 120 mph Exp C) and safe crane/skid-steer rigging.
4. ASTM E136, Bond Beam, Lintel & Finish Checks Not Yet Tested ASTM E136 noncombustibility; 4'×8' haunched 3-in bond beam & 6'-2" lintel load test (L/240); HETA20 pullout; patch color match & seam cracking. Supports NCRC R316.5.1 concrete thermal-barrier compliance, roof uplift anchorage, and architectural durability under thermal cycling.
5. NC PE Stamp & Local Code Pre-Check Per-House Path 2018 NCRC R104.11 / IRC R301.1.3 PE-sealed design + Raleigh R316.5.1 pre-check + unwired-shell confirmation (zero NC Modular). Required permitting pathway for Houses 1–3 prior to funding any broader $65k–$90k ISO 17025 / DrJ TER / Intertek CCRR listing campaign.

STAGE 01: REV 2 BOM, PANEL WEIGHT & SITE-SPRAY MODELS [COMPLETE] · STAGE 02: $500 MOCK-UP & CYLINDER/AC422 LAB MATRIX [NEXT] · STAGE 03: NC PE STAMP & HOUSE #1 PROTOTYPE [PENDING]