| Class F Fly Ash (ASTM C618) |
60–65% geopolymer binder |
NC / SC commercial hubs (~35 mi from Raleigh) |
$225 |
$412 |
Published index $125/MT |
| GGBFS Slag Cement |
35–40% ambient cure (no kilns) |
SE bulk delivery (est. $110/MT del.) |
$132 |
$242 |
Modeled estimate |
| Granite Sand / NC Stalite |
Aggregate (131 pcf sand or 108 pcf LWC) |
Raleigh quarries / Gold Hill–Salisbury NC (~105 mi) |
$206* |
$376* |
Sand verified; Stalite $115/t est. |
| Liquid Sodium Silicate (multi-tote) |
Alkaline activator (bulk contract) |
NC chemical hubs ($600/MT) |
$355 |
$649 |
Published bulk contract |
| 50% NaOH Caustic Soda (IBC tote) |
Alkaline activator |
NC municipal bid / Charlotte–Greensboro ($733/MT) |
$190 |
$347 |
Published municipal bid |
| Retarder / HRWR Admixture |
30–45 min slag-blend open time |
Commercial admixture ($10/m³ est.) |
$46 |
$84 |
Modeled estimate |
| 6.0-in Rigid EPS Core (CNC) |
Continuous R-22 core (ASTM C578) |
Direct NC/VA molders (Statesville / Cherryville) |
$1,440 |
$2,630 |
Direct molder $1.80/sf |
| AR-Glass Chopped Fiber (1/2 in, 0.5% vol) |
Crack-control fiber (ZrO₂ ≥ 16.5%) |
Commercial Cem-FIL bag stock ($4.00/lb) |
$489 |
$894 |
Published catalog |
| AR-Glass / EIFS 4.5 oz Mesh (both faces) |
Full-surface skin reinforcement |
Commercial alkali-resistant mesh ($0.10/sf) |
$162 |
$296 |
Catalog + overlap/freight |
| 45° GFRP Shear-Grid Ties |
Composite thermal-break ties @ 24" o.c. |
SE GFRP pultruders (modeled $0.76/lf) |
$317 |
$579 |
Modeled estimate |
| Integral Iron-Oxide Pigment + Sealer |
Through-body color + clear matte siloxane |
NC masonry yards ($3.20/lb + sealer) |
$125 |
$229 |
Published catalog |
| Bond Beam, Hardware, Seals, Chases & 5% Waste |
#4 GFRP, sill track, inserts, bolts, HETA20, seals, release, trim |
NC structural & precast hardware supply |
$1,747 |
$3,115 |
Modeled estimate |
| Rev 2 Baseline Total Materials (incl. 5% waste, symmetric 1.0/1.0 shop baseline) |
$5,435 |
$9,852 |
$7.36/sf / $7.31/sf net est. |